TORRES NOVAS – 163 kWp – 194 MWh/year
Alter Enersun has 7 public building facilities in the town of Torres Novas since 2015. These are located in: the G.Pinto Lopes Municipal Library, the G.Pinto Lopes Auditorium, the Torres Novas Market, the Kindergarden building (Riachos), the Meia Via School Center, the Chandelaria Assentis School Center and the Serra Aire School Center.
The sum of the installed peak powers for the 7 facilities amounts to 163 kWp. Following the technical calculation by the Alter Enersun team, its electrical production for this year is estimated in 194,27 MWh/year.
LOCATION: Torres Novas (Santarém District, Portugal)