TALAVERA – 60 kWp – 651 MWh/year
Since 2015, Alter Enersun has a ground-based photovoltaic installation in the town of Talavera la Real, in the province of Badajoz. It is divided into four different phases: Enersol 2006, Barragán 1964, Barragan 1987, Barry 1964 and Plutón 1964, which total 60kWp of installed power.
The facility thus plans to achieve a total annual production of electrical energy of 650,838 MWh for this year.
LOCATION: Talavera la Real (Badajoz, Extremadura)