GP – 75 kWp – 98 MWh/year
In August 2017 Alter Enersun acquires the GP plant (GIL MARTÍN) with an installed power of 75 kWp. It is located in the La Gravera Industrial Park, in the municipality of Lepe (Huelva).
This is a rooftop installation that is estimated to generate 97,714 MWh/year, during the current year.
LOCATION: Lepe (Huelva, Andalusia)