Proyectos
Proyectos

ENTRONCAMENTO – 254 kWp

ENTRONCAMENTO – 254 kWp – 335 MWh/year

Since 2015, Alter Enersun has had a series of photovoltaic installations located in public buildings of the Portuguese municipality Entroncamento, which belongs to the Santarém District. These are specifically 8 infrastructures located in: The Municipal Market, the Parking Lot, Municipal Pavilion, Municipal Swimming Pools, Paços do Concelho Building, DGUP/DASU Building, Antonio Gedeão Basic School and  y Sophia Mello Breyner Kindergarden.

All these facilities together sum a total installed peak power of 254 kW and are expected to generate 335,251 MWh/year of electrical energy.

LOCATION: Entroncamento (Santarém, Portugal)

See list of projects