Alter Enersun, awards of the third auction of renewable energies

On July 26, 2017 took place the third auction of renewable energy in which more than 5,037 MW awarded the maximum discount (no charge for the final electric consumer).

In relation to the total power, 3,909 MW (77.6%) were for photovoltaic technology, of which Alter Enersun was awarded 50 MW.

With this project Alter Enersun would have 150 MW in photovoltaic installations for 2020 between Spain, Portugal and Mexico.